Diverse Civil Engineering Projects
Flood Risk Planning and Mitigation
Okanagan Landing Road Flood Protection - Marshall Field’s Wetland Detention and Creek Diversion | City of Vernon | City of Vernon, British Columbia | Site Resident and Contract Administrator (CA).
Contract Administrator and Site Resident (CA) on multi-season heavy earth project including installation of channels, weirs, and headwalls, and 90m of 3.6m x 2.7m concrete box culvert.
Power
Keewatinohk Converter Station - 500kV High Voltage Converter Station | Manitoba Hydro | Keewatinohk, Manitoba | 2015-2019 | Owners Civil/Structural CM and Interim Quality Manager.
Response as Manitoba Hydro seconded Civil Lead, and Interim Project Quality Manager, in construction management of seconded and contract personnel as well as First Nation partners tasked with scope, quality, and schedule management on a $1.2B remote site multi-trade EPC High Voltage Direct Current Converter Station project with civil, power and process scope.



Military Infrastructure
CFB Esquimalt, Utility Corridor | Department of National Defence | Esquimalt, British Columbia | Linear Infrastructure Designer.
DND Secret Clearance designation. Response in stage-gate design and constructability evaluation for utility realignment and arrangement inside an accessible concrete Utilidor.
Wastewater Pump Stations
Golden Ears Pump Station and SSO Tank | Metro Vancouver | Maple Ridge, British Columbia, | Technical Resident and Owners CM.
Response in CM functional support of the remote Contract Administrator in day-to-day technical and contractual matters in the execution delivery of a 1.1 ML wastewater attenuation tank, and 1200 LPS wastewater pump station including ancillary mechanical, electrical, and architectural scope.




Conveyance - Water Storage Reservoirs & Tanks.
Kelowna Integrated Water Project - Phase 1 | City of Kelowna | Kelowna, British Columbia, Canada | 2019 | Sr. Site Resident.
Response in technical field representation on behalf of the Designer in supporting the construction of two new water reservoirs having a combined storage capacity of 4.5ML; two retrofit, and one new pumping station, having a combined discharge capacity of 15000 LPS. Primary role in CM quality assurance, with material involvement in builder demand-based constructability review prior to issuance of IFC draw.
Roads Highways Bridging
South Fraser Perimeter Road | Fraser Construction Group | Surrey, British Columbia | Technical Resident.
Response in technical coordination and quality assurance on behalf of Stantec’s EoR in-scope delivery of the municipal infrastructure interface on $1.1B 42 km brown and green field Design-Build Highway project, including 9 flyover structures and utility interface realignment within the road corridor limits located in three lower mainland British Columbia municipalities.
Simon Fraser Bridge Rehabilitation | Ministry of Transportation | Prince George, British Columbia | Ministry Representative.
Response in client-side Construction Management on substructure reinforcement, and redecking a 390m double lane bridge span with Polyester polymer concrete over the Fraser River; including installation of a new 52m jump span substructure , new expansion joints at the abutments, and reinforcing the substructure truss to increase capacity.Â




Linear Infrastructure
Kelowna Integrated Water Project - Phase 1 | City of Kelowna | Kelowna, British Columbia, Canada | 2019| Technical Resident.
Response in CM field review and assessment and monitoring of Designer’s risk in scope and quality assurance in design-build delivery of 80 kilometers of potable water main and associated pressure zone and distribution plant and facilities.